Plan Charge Types allow flexibility in Ordway to bill a customer based on specific use cases and scenarios. Plans can include multiple charges; each one with a different charge type as needed. Plan
Charge Types are determined when creating a Plan. Read more about creating a Plan in Ordway. Ordway offers three charge types which are selected at the Charge level:
One-Time
Generally used for a one-time or non-recurring fee, such as an initial setup fee, cancellation fee, or termination fee.
Examples
- Connection fee charged at the beginning of a contract
- Setup fee
- Delivery charge
Important |
If a subscription containing a One-Time Charge is cancelled after the service term has ended, Ordway does not remove or refund the completed One-Time Charge, regardless of the configured cancellation settings. This ensures that charges for fully delivered services are retained. For more information about subscription cancellation behavior, see Cancel Subscription. |
Recurring
These charges are most commonly used in Subscription Contracts to reflect charges billed on a periodic basis. Billing frequency can be established in multiples of days, weeks, months, financial periods, or years.
In addition, each charge can be customized with separate billing period boundaries and billing date allowing you to specify the billing period by calendar month with a partial period proration or it can be configured it to start the day the customer signs up.
Example: A Monthly service contract.
Usage Based
These charges are used to track metered variable usage when charging for a product based on the number of units consumed. Usage based charges are due at the end of the billing time frame and the Customer pays only for what is used.
Example: A cell phone plan that charges customers based on the number of gigabytes consumed during a period.
Recognize on invoicing is not recommended as a Revenue Recognition Rule for usage-based charges because revenue is typically recognized in the financial period of the usage record date and invoiced in arrears.
Using Plan Charge Types
Plan Charge Types are determined when creating a Plan. Read more about creating a Plan in Ordway.
Comments
0 comments
Please sign in to leave a comment.